Low-impact waterway erosion control also cares for fish

The Belmore Downs gully remediation stage 2 project addressed erosion control, while at the same time ensuring the on-ground work was compliant with Fisheries Act regulations about waterway barriers. 

One of the eroding gullies, referred to as gully 3B on the map, pictured, right, was identified as a low-impact (green) waterway. 

Gully maintenance and monitoringNeilly Group Engineering designed a rock chute (spillway) to meet the Accepted Development Requirements for that kind of construction on a low-impact waterway.

The work is part of the Gully Maintenance and Monitoring project at NQ Dry Tropics.

The spillway design followed specific criteria:

Plan to build a fish-friendly erosion control structure.
NQ Dry Tropics Civil Works Coordinator Damian Flintham and Neilly Group Engineering Project Implementation Coordinator John Drysdale look over the spillway design for Gully 3B.
  • A spillway channel integrated into the design on the downstream side of the weir or dam.
  • The channel must have a continuous slope without abrupt vertical drops.
  • No vertical drop where the spillway meets the natural bed of the waterway.

Geometrical conditions include:

  • A maximum grade of 5 per cent (1 in 20 slope).
  • A concave shape.
  • For a height or drop greater than 3 metres above the waterway bed, the design required:
    • 3-metre diameter pools at 20-metre intervals along the channel.
    • A minimum pool depth of 300mm below the spillway bed.

The spillway and pools now serve dual purposes. The spillway controls erosion, and the pools facilitate fish migration by creating resting areas, ensuring the upstream passage of fish is not obstructed.

Neilly Group Engineering Project Implementation Coordinator John Drysdale is pictured standing in one of the 3m diameter pools.The pools provide resting areas for fish, ensuring their upstream passage is not obstructed. For erosion control, the spillway channel manages water flow, preventing further sediment loss.

This project is part of the Landholders Driving Change Program funded by the partnership between the Australian Government’s Reef Trust and the Great Barrier Reef Foundation.

You might also find these interesting

Please share this project...

Back to Project

Erosion control construction also fish-friendly
The Belmore Downs gully remediation stage 2 project addressed erosion control, while at the same time...

Other stories

Filtering posts by tag pLDC

Protected: Celebrating 10yrs of LDC

There is no excerpt because this is a protected post.
Read More →

Scientific data a foundation

Almost 30 years of scientific data has provided the data “bones” for change in North Queensland grazing management regimes. Beginning in 1997, led by Department ...
Read More →

Birriah cultural awareness training

Understanding Country, culture, and the importance of protecting cultural heritage was the focus of a recent workshop delivered by Birriah Aboriginal Corporation Directors Carolyn Kemp ...
Read More →

Heart of the Farm

The Heart of the Farm Ladies Luncheon in Collinsville was inspiring thoroughly enjoyed by all who attended. Held at the Collinsville Golf Club on 14 ...
Read More →

Are legumes the future?

Could legumes help shape the future of northern grazing systems?  It’s a question that sparked plenty of conversation when graziers visited Maryvale Station north of ...
Read More →

Challenges, risks and successes

One of the standout stops on a recent grazing tour was Amelia Downs, near Charters Towers, in basalt country, where Jane and Jordan Moore gave ...
Read More →

Other stories in this edition

Secret Link
Filtering posts by tag pLDCFiltering posts by tag g34Filtering posts by tag g34