Monitoring and maintenance on BBB gullies

Author picture
Home / Uncategorized / Monitoring and maintenance on BBB gullies

Landholders Driving Change gully repairs analysed for effectiveness

The Landholders Driving Change (LDC) project successfully remediated 24 gullies — 19 small-scale and five large-scale — across the Bowen-Bogie-Broken (BBB) catchment area between 2017 and 2022.

These efforts collectively addressed more than 11,000 linear metres of gully erosion originating from 54 gully heads, resulting in an estimated annual reduction of 5,536 tonnes of fine sediment reaching the Great Barrier Reef each year.

Since 2022, annual monitoring has been conducted to assess the effectiveness of these remediation works and to identify maintenance needs.

Monitoring showed eight sites — comprising five small-scale and three large-scale gullies — required minor maintenance, including repairs to diversion bank walls, rock chutes, check dams, and the management of rill erosion and invasive weeds.

The project is scheduled to conclude in mid-2025, at which point a comprehensive technical report will be produced.

This report will detail the monitoring framework, maintenance prioritisation processes, site characteristics, and the outcomes and lessons learnt from each site. 

Additionally, it will provide insights into the timeframes and costs associated with maintaining gully stability in the long term, thereby providing confidence in investment and sediment reduction strategies.

Graziers in the BBB catchment are actively collaborating with NQ Dry Tropics as part of the Burdekin Major Integrated Project – Gully Maintenance and Monitoring project, to develop a shared understanding of gully erosion, its causes, how to fix it, and the ongoing maintenance required to ensure long-term success.

Monitoring and maintenance ensures interventions continue to work as intended.
Gully repair work at Hillview Station to slow the flow of water down this slope.

Many graziers, including Scottville grazier Barry Collett, have been hands-on in addressing small-scale erosion issues, taking the initiative to implement sustainable grazing practices.

These practices aim to reduce grazing pressure, allowing vegetation to re-establish on previously eroded areas.

Graziers have played a vital role in observing the outcomes of rehabilitation efforts over consecutive years.

Their firsthand experiences provide valuable insights into what strategies have worked and what needs improvement, as they work toward finding maintenance solutions that are both effective and sustainable.

By partnering with NQ Dry Tropics, graziers like Barry Collett have shared their experiences, particularly the challenges of dealing with sodic soils and identifying long-term solutions to prevent sediment runoff, thereby protecting the land and local waterways.

Barry Collett shares his insights here (or click on the image).
Gully repair at Todsure after vegetation has had time to establish.
A rock chute to help slow water at Emohruo near Scottville.

Burdekin grazier Paul Fry has witnessed firsthand the complexities of large-scale gully remediation at Strathmore Station, where significant efforts were made to address soil erosion and prevent the loss of fine sediment into nearby waterways.

The Strathmore Station rehabilitation project focused on ground intervention to reduce erosion, establish vegetation, and reduce the export of sediment.

Unlike typical gully rehabilitation projects, which target more defined trunk gullies, the Strathmore site featured a vast amphitheatre of erosion, with wide gully floors and substantial topsoil loss across large areas. 

The remediation work primarily involved revegetating the catchments above the gullies to prevent further expansion of the eroded areas.

Paul said soil had been washing away from the catchment for an extended period and fixing the area was essential. However, he also noted the significant challenges involved in addressing large-scale gullies.

“It’s a huge undertaking to fix large gullies,” Paul said. “It costs millions of dollars… bulldozers, machinery, operators—it all adds up.”

Paul highlighted the importance of cost-effectiveness and the necessity of long-term maintenance, saying that without ongoing maintenance, the investment in gully remediation would be wasted.

He also emphasised the need for a skilled, local workforce to take part in the process, ensuring local people understood different rehabilitation techniques and took ownership of the projects.

He recognised that while heavy machinery like bulldozers could be beneficial, a lighter touch, such as using hay bales, constructing bund walls, and installing rock chutes, had proven effective in certain sections of the Strathmore gullies. This approach would need to be monitored to see how well it holds up.

Ultimately, Paul stressed that managing the land effectively — by being mindful of stock numbers, spelling paddocks, implementing weed management, and ensuring the correct placement of infrastructure like fencing and water points — is key to long-term success in landscape repair.

Discussing the efficacy of the work are, from left: NQ Dry Tropics Civil Works Coordinator Damian Flintham, grazier Paul Fry, NQ Dry Tropics Senior Grazing Field Officer Brad Martin and NQ Dry Tropics Soil Conservation Officer Bernie Claussen. Read the story behind the work at Strathmore and watch a video here (or click on the image).
A gully complex at Strathmore Station photographed one wet season after works were completed.
Grit editions

No Posts Found

Also in this edition

No Posts Found

This project is part of the Landholders Driving Change project funded by the Queensland Government through the Queensland Reef Water Quality Program.

You might also find these interesting

Please share this project...

Back to Project

Monitoring and maintenance on BBB gullies
The Landholders Driving Change (LDC) project successfully remediated 24 gullies — 19 small-scale and five large-scale...

Other stories

Filtering posts by tag pGMM22

Maintenance project wraps up

This month the Gully Maintenance and Monitoring project will wrap up. Between 2017 and 2020, the Burdekin Major Integrated Project (Landholders Driving Change) completed 25 ...
Read More →

Newly completed works rain-tested

A streambank rehabilitation project we’re excited to share in an upcoming video has certainly been on quite the journey. Delivered in the wake of the ...
Read More →

Soil science graduates

We’re thrilled to be part of the Queensland Soil Science Graduate and First Nations Engagement Program, a 12-month initiative accelerating the development of graduate scientists ...
Read More →

Technical report available

For many years, NQ Dry Tropics has been carrying out gully remediation works — large and small — across the Burdekin region. It’s become clear ...
Read More →

Maintenance essential to rehabilitation

Five rock chutes were constructed as part of phase two of the Mt Wickham gully remediation project. The chutes were designed to intercept flows and ...
Read More →

Repair on Belmore gullies working well

The gullies, which have been reshaped, rock chutes installed, and revegetated, were until repair, sending an estimated 4617 tonnes of sediment downstream every year. Until ...
Read More →